Volta River Authority
1. The scope of works will cover the replacement of the existing CO2 system (bottles and all accessories), obsolete electromechanical panel, solenoid valves, cables, discharge pipes, beacons and sounders and manual ...
Published - 22nd April, 2024
Deadline : 30th May, 2024
Volta River Authority
1. EPC Contract - Engineering, Procurement and Construction for the Conversion of 2 x 110 MW Simple Cycle Gas Turbine to Combined Cycle Power Plant.
2. The Kpone Thermal Power Plant consist of two (2) ...
Published - 25th October, 2022
Deadline : 15th November, 2022
Volta River Authority
1. The Kpone Thermal Power Plant consists of two (2) GT11N2/EV Alstom Gas Turbine Generators (GTG) which have been in operation since June 2016. The VRA wishes to convert the 2x110...
Published - 17th May, 2022
Deadline : 15th June, 2022