Tender Details

Tender Name:
CONSTRUCTION OF FULL & LIMITED MECHANIZED WATER SUPPLY SYSTEMS IN THE VOLTA REGION
Tender Type:
NCT
Package No:
VR/VRCC/NCT/001/2017
Post Date:
14th July, 2017
Closing Date:
21st July, 2017
Currency:
-
Price of Tender Document:
1000.00

Tender Description:
1. The Government of the Republic of Ghana has made available funds from the Ghana-Spain Debt Swap for Development Programme for the construction of water facilities in 35 localities in four (4) selected Districts of the Volta Region namely Ho Municipal, Ho West, Agotime-Ziope and Adaklu District Assemblies.

The Volta Regional Co-ordinating Council intends to use part of the funds for the construction of fully mechanized systems and limited mechanized systems of water facilities in the selected districts.

2. The Volta Regional Co-ordinating Council in collaboration with beneficiary District Assemblies and using TRAGSA and Community Water & Sanitation Agency (CWSA) as the Consultants, now invites sealed bids from interested bidders for the following:
(a) Construction of groundwater based Limited Mechanized Water Supply Systems
(b) Construction of groundwater based Fully Mechanized Water Supply Systems
(b) Construction of Surface Water based Fully Mechanized Water Supply Systems
in the beneficiary Districts.

3. The table below shows the details of the works:
Principal Information
Lot No.
District
Towns
Description Bid Security MWRWHClassification Validity of Bid Security
CONSTRUCTION OF PIPED WATER SUPPLY SCHEMES
1. ADAKLU Adaklu Tsrefe, Adaklu Agblefe, Adaklu Alavanyo, Adaklu Goefe, Adaklu Abuadi, Adaklu Kordiabe, Adaklu Torkor, Adaklu Helekpe, Adaklu Sikama, Adaklu Awanyaviofe • Construction of Reinforced Concrete Overhead-tanks of 20m3 (ground), 30m3 (2No.) & 40m3
• Mechanization of 3No. boreholes including electricity supply and construction of pump control rooms
• Laying of HDPE/uPVC PN10 – 90mm OD transmission (3.3km) and distribution (10.82km) pipe lines including associated valves and fittings
• Construction of 33No. Public standpipes
• AQUALITE Iron Removal Plant (2No.)

GHS100,000.00

D1,K1

180 days
2. AGOTIME - ZIOPE Ziope, Batume and Akpokope • Construction of Reinforced Concrete Overhead-tanks of 12m heights, 30m3 & 40m3
• Mechanization of 3No. boreholes including electricity supply and construction of pump control rooms
• Laying of HDPE/uPVC PN10 – 90mm OD transmission (1.8km) and distribution (6.5km) pipe lines including associated valves and fittings
• Construction of 23No. Public standpipes
• AQUALITE Iron Removal Plant (1No.)

GHS100,000.00

D1,K1

180 days
3. HO MUNICIPAL & HO WEST Kissiflui, Norvisi, Abutia Kloe, Abutia Agorve, Abutia Teti, Dededo and Sawyer Kordzi • Construction of Reinforced Concrete Overhead-tanks of 12m high 50m3 (2No.), & 40m3 (ground)
• Mechanization of 5No. existing boreholes including electricity supply and construction of pump control rooms
• Laying of HDPE/uPVC PN10 – 90mm OD transmission (3.0km) and distribution (8.59km) pipe lines including associated valves and fittings
• Construction of 31No. Public standpipes

GHS100,000.00

D1,K1

180 days
4. HO WEST Anyirawase, Saviefe Agorkpo, Saviefe Deme, Saviefe Gborgame, Kpale Xorse, and Kpale Ga • Construction of Reinforced Concrete Overhead-tanks of 20m3 (ground), 12m high 30m3 (2No.), & 50m3 (ground)
• Mechanization of 5No. boreholes including electricity supply and construction of pump control rooms
• Laying of HDPE/uPVC PN10 – 90mm OD transmission (3.3km) and distribution (10.82km) pipe lines including associated valves and fittings
• Construction of 31No. Public standpipes
• AQUALITE Iron Removal Plant (1No.)

GHS100,000.00

D1,K1

180 days
5. HO WEST & HO MUNICIPAL Dzolo Gborgame, Matse Have, Matse Begbe, Matse Tsrefe, Matse Dzeve • Construction of Reinforced Concrete Overhead-tanks of 20m3 (ground), 6m high - 60m3
• Mechanization of 3No. boreholes including electricity supply and construction of pump control rooms
• Laying of HDPE/uPVC PN10 – 90mm OD transmission (2.64km) and distribution (8.0km) pipe lines including associated valves and fittings
• Construction of 31No. Public standpipes





GHS100,000.00





D1,K1





180 days
6. ADAKLU & AGOTIME - ZIOPE Agotime Afegame and Adaklu Waya • Construction of surface water intakes (2No.)
• Construction of treatment plants including Settling Tank, URF, SSF (2No.)
• Construction of Reinforced Concrete Overhead-tanks of 70m3 (ground) & 12m high 30m3 and 60m3
• Mechanization of Low Lift Station & High Lift Station 2No. Centrifugal Pumps including electricity supply and construction of pump control rooms
• Laying of HDPE/uPVC PN10 – 90mm OD transmission (3.5km) and distribution (5.56km) pipe lines including associated valves and fittings
• Construction of 19No. Public standpipes
• AQUALITE Iron Removal Plant (1No.)


GHS100,000.00


D1,K1


180 days
7. HO WEST & HO MUNICIPAL Amedzofe and Shia • Construction of surface water intakes (2No.)
• Construction of Treatment Plants including Settling Tanks, URF (2No.), SSF (2No.)
• Construction of Reinforced Concrete Overhead-tanks of 12m high 30m3 (2No.) and 80m3 (ground), 10m3 POLYTANK on steel tower – 6m high
• Mechanization of Low Lift Station & High Lift Station 4No. Centrifugal Pumps including electricity supply and construction of pump control rooms
• Laying of HDPE/uPVC PN10 – 125mm OD transmission (2.1km) and distribution (5.85km) pipe lines including associated valves and fittings
• Construction of 23No. Public standpipes
• AQUALITE Iron Removal Plant (1No.)


GHS100,000.00

D1,K1

180 days
Additional Information:
Source of Funds:
Internally Generated Funds
No. of Lots:

Agency:
Volta- Regional Coordinating Council
Region:
Volta
District:
Ho Municipal District
Contact Person:
Community Water and Sanitation Agency P. O. Box HP 508, Ho. Volta - Region
Email:
vrcwsa@yahoo.co.uk
Telphone:
+233 03620-28186/28189 or 020-8828828
Fax:
+233 03620-28266
Website: